Project Overview

When a sprinkler head unexpectedly burst in a busy office, it caused significant water damage to approximately 8,000 square feet of office space and 3,000 square feet of manufacturing space. The sudden water intrusion fiercely disrupted daily operations, as the sprinkler damage affected 85% of the office space, causing the office to shut down for several days while clean-up and drying began.

Quick Facts

  • Space Affected: 11,000 square feet
  • Project Duration: 10 days
  • Equipment Required: 100 air movers, desiccant dehumidifiers
  • Round Dollar Value: $150,000

The Impact

Sasser Restoration acted swiftly upon receiving the call, deploying multiple extraction trucks and arriving onsite within 20 minutes.  Despite the severity of the damage, our dedicated efforts resulted in the thorough cleaning, drying, and repair of the building within an impressive 10-day timeframe. This comprehensive approach ensured that the property was not only restored, but brought to a condition surpassing its pre-loss state. Sasser swiftly completed mitigation and repairs valued at $150,000 for the production floor, ensuring no downtime as employees worked remotely.

Contact A Sasser Professional

11000
Sq. Ft.
10
Days for Project Completion
$150K
In Mitigation and Repairs